Resolution

All pages

27 · What it costs to run

Cost is a first-class number in this fund, not an overhead line. At the capital a single person deploys, the cost ratio is often larger than any plausible edge, and a system that hides that is lying to its owner. So cost is budgeted before it is spent, attributed to the artefact that caused it, and reported next to every return figure.

27.1 Where the money goes

LineDriverNotes
Model callswakes × seats × tokens × tier pricethe dominant line; roughly 70–85% of running cost
Embeddings and retrievalcorpus size × re-index frequencysmall, but re-indexing on a model change is a step cost
Research datavendor subscriptionsthe free regulatory layer (§19.4) carries the first year
Market data entitlementsper exchange, per month, non-display tariffszero on paper; the largest step change at go-live
The Wireowner requests for Brief me and Ask onlyzero at rest: the stream, relevance and panes are code over data already paid for (R-UI-100); on-demand reads have their own daily budget
Search and socialstanding queries × cadence × price per query; Ask searchesits own daily budget; reported as cost per item that reached a scored view (R-CONN-082)
Compute and storageone machine, object storage, second providermodest and predictable
Broker fees and financingtrades, borrow, margin, FXzero on paper
Legal, tax and accountingone-off opinions, annual filingsjurisdiction-dependent; a mandate row

27.2 The arithmetic

The model line is computable rather than guessable, and the computation is the point: the fund knows what it will spend before it spends it.

Per variant, per trading day, at the default cadence: one morning wake and one evening wake, plus event-triggered wakes inside the research budget (R-SRC-005, default 2 × analyst wakes/day). A wake runs candidate triage (T3), claim extraction on what triage kept (T2), views on what survives (T1), a cold and a warm bear twin (T1), a two-ordering debate with a judge (T1), Idea Book bids (T2), a PM proposal, a risk memo and a compliance line (T1/T2). Call it, per variant per day:

  • T3 filtering: a few hundred short calls
  • T2 working: tens of medium calls
  • T1 reasoning: tens of long-context calls, which dominate the bill

The two controls that move this number most are prefix caching (R-MODEL-021), which removes the constitution and role from the priced input on every repeat call, and batching (R-MODEL-051) for everything without a deadline. Both are mandatory for that reason.

  • R-COST-001 (MUST) The cost model is computed from the actual call record, not estimated: the Floor shows cost per wake, per view, per desk, per variant, per day, per month, against budget, with the previous period's actuals as the forecast basis.

27.3 The shape of the bill

Orders of magnitude, stated as ranges because provider prices move and the roster is a mandate row. These are budgets to be validated by the spikes, not quotes.

ConfigurationModel spendDataInfrastructureTotal per month
One variant, paper, free datalow hundreds of euros~0tenslow hundreds
Three variants, paper, free datamid hundreds to ~1k~0tensseveral hundred to ~1k
Three variants, paper, with research data vendorsmid hundreds to ~1k50–300tens~0.5k–1.5k
Three variants, one live slice, entitlements for one marketas above150–600~100~1k–2k
Live across several markets, options and tick dataas above500–2,000+~150~2k–4k+
  • R-COST-002 (MUST) The cost ratio — annualised total cost ÷ NAV — appears next to every return figure on every screen and in every letter (R-SCORE-022). At €250k of capital, €1,500 a month is 7.2% a year, and the fund states that number rather than burying it.
  • R-COST-003 (MUST) The cost table is a mandate row with a hard monthly cap at each of three levels — per wake, per day, per month — and the monthly cap is a kernel halt state (budget), not a warning. A fund that cannot afford to run stops running.
  • R-COST-004 (MUST) The cost gate on evidence. Before a live slice is funded, the fund states the factor-residual return required to cover its own cost at that capital, with an interval, and the evidence plan's thresholds are set above it. An edge that exists but does not clear its own costs is reported as exactly that, and is not a reason to add capital.

27.4 Cost as a design constraint

Three design choices in this specification exist because of the arithmetic above, and are recorded here so they are not later mistaken for arbitrary complexity:

  1. Three variants, not ten. The tournament's value grows slowly with variant count and its cost grows linearly. Three is the smallest number that can disagree.
  2. Tiering by task, not by prestige. Most of the call volume is T2 and T3. Using a reasoning model for extraction would multiply the bill without improving the gold-set error rate.
  3. The free regulatory layer first. The Data desk's first factories (§18.3) are built on sources that cost nothing but attention, which is the only input this fund has in surplus.